I’ve been up for 3 hours, and I’m already tired.

Let me back up. Four years ago, due to a poorly-constructed addition (before we moved into the place), our roof leaked; catastrophically so. It took us a bit to figure out what was happening, since the leak took place inside a wall. But by the time we did, the dreaded mold had set in.

This actually happened shortly after we started remodeling a different room, and discovered that asbestos had been used in the glue for the linoleum flooring, and in the acoustic popcorn from hell coating the ceilings. So we had already started talking to a company, Alliance Environmental, that specialized in asbestos (and now mold) remediation.

I tried fixing the leak myself, but that didn’t work; shortly after Alliance came in to pull out the asbestos and damaged drywall and remove the mold from the framing, the roof leaked again, so I put them on hold while we had the roof fixed.

We had the roof redone, completely, where they found more water damage. So that was taken care of. We worked on the initial bedroom, putting insulation (when the house was built, insulation wasn’t important!) in the walls, putting up new, non-paper-faced drywall, new windows, bookshelves, and floor tile due to not being able to seal the concrete floor and too much moisture coming up from the concrete slab.

Fast forward a couple of years, and we’re finally ready to finish the job started a few years ago. We just had Alliance back out to take care of the popcorn ceiling in the kitchen, where they also finished the final bit of mold cleanup, from the last of the leaks we knew about.

The guys who pulled out the damaged drywall and cleaned up were absolutely stellar; it took them about a day and a half to do (most of that was setting up the environmental containment stuff — I’ll post pictures soon, but our house looks kind of like what they set up in E.T. when the government moved in), and they finished yesterday. Now, an inspector from the company, as well as a tester from an independent lab have to come out to verify that all the asbestos and mold are gone from the air in the contained area. If that’s the case, they can take down the plastic and we can get at our kitchen again (today breakfast was root beer and pop tarts, yum), and start doing the actual fixes.

The other projects that are coming together with this are:

  • putting the stereo equipment in a built-in closet in the family room
  • retexturing the kitchen walls and ceiling with something not-sprayed-on, and fixing all of my unhappy drywall repairs after ripping out the old, too-big-for-the-kitchen island cabinets
  • insulating more outside walls where drywall’s been removed
  • and putting soundproofing (or rather, sound-reducing) items between the bedroom we’ve finished, the bedroom we’re remodeling, and the family room.

Since we’re actually doing work instead of just talking about it, I’ll try and post more about what’s actually going on. So there should (should }:> ) be more posts for a little bit.